Register
|
Login
MENU
Home
Employers
Post Jobs
Employer Services
Employer Membership
Search Resumes
Job Seekers
Search Jobs
Post Resume
Job Seeker Services
Employer Lists
Register
Login
Register
|
Login
Electrical Cost Estimator - Data Center Construction (Anticipated Opening)
Turner & Townsend
Dallas, TX
Category
Engineering
Apply for Job
Remote
Job Description
Turner & Townsend is seeking an experienced Electrical Cost Estimator to support the delivery of large-scale, mission-critical data center projects. The Electrical Cost Estimator will be responsible for preparing detailed electrical estimates for hyperscale data center projects, including high-capacity power distribution, backup generation, and critical electrical systems.
Requirements
Prepare detailed electrical cost estimates for data center projects, including medium- and low-voltage distribution, UPS systems, generators, switchgear, busway, grounding, and lighting.
Perform comprehensive quantity takeoffs from drawings, specifications, and BIM models, including conduit, cable, busway systems, switchgear, transformers, generators, and associated infrastructure.
Develop accurate labor, material, and equipment pricing models aligned with project budgets, delivery strategies, and market conditions.
Maintain historical cost data, benchmarking tools, and estimating assumptions to support future projects.
Review and analyze electrical contractor and subcontractor bids, identifying scope gaps, cost risks, and value improvement opportunities.
Support value engineering and design optioneering, assessing alternative materials, system layouts, and installation methods while maintaining redundancy and performance requirements.
Collaborate with engineering and construction teams to inform electrical system decisions based on cost, constructability, schedule, and procurement impacts.
Identify and assess risks related to long-lead electrical equipment, labor availability, and market volatility.
Account for regional cost variations across U.S. markets, including labor rates, logistics, permitting requirements, and utility infrastructure impacts.
Support estimating for high-capacity power infrastructure, including substations, utility tie-ins, and campus-wide electrical distribution.
Contribute to standardized data center designs and repeatable delivery models to improve cost predictability and speed to market.
Ensure electrical estimates align with applicable codes, safety standards, sustainability objectives, and energy efficiency requirements.
Prepare clear, well-documented estimating deliverables for internal and external stakeholders.
Participate in cost reviews, procurement discussions, and commercial strategy sessions.
Support change management by evaluating electrical scope changes and associated cost impacts throughout the project lifecycle.
Provide estimating handover documentation to construction teams to support execution consistency.
SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Benefits
Generous Paid Time Off
401k Matching
Retirement Plan
Health insurance
Flexible working hours
Professional development opportunities
]]>